Propower completed the electrical works for an effluent system upgrade at The Gums Dairy Company in Outram.
The project included the design and installation of a new control system, electrical infrastructure between the dairy shed and effluent pond, and power and controls for the pumping system. The works also involved transitioning operations from the existing pond to the new system while maintaining the farms ability to irrigate during the changeover.
The completed installation provides a practical, reliable control solution to support the farm's ongoing effluent management and irrigation operations.